Updates to our Terms of Use

We are updating our Terms of Use. Please carefully review the updated Terms before proceeding to our website.

Saturday, November 7, 2026
Courthouse News Service
Saturday, November 7, 2026 | Back issues
Courthouse News Service Courthouse News Service

Private robotic moon lander launches from Kennedy Space Center

The autonomous lander is slated to land on the moon Feb. 22 and spend a week gathering information before shutting down.

(CN) — Space exploration company Intuitive Machines took a shot at becoming the first private company to successfully land a craft on the moon, with the early-morning launch of its Nova-C lunar lander "Odysseus" from Florida's Kennedy Space Center on Thursday.

The launch mission, dubbed IM-1, was initially scheduled for Wednesday but technical concerns delayed it by a day.

The Odysseus — carrying a dozen commercial and scientific payloads — is aimed at a target site near the lunar South Pole.

The flight is expected to take about a week, with touchdown on the lunar surface slated for next Thursday. Intuitive Machines said in flight information materials that it expects the robotic craft to operate for another week before shutting down for good.

A SpaceX Falcon 9 rocket carried the autonomous lander into orbit. Both the launch and the lander's suite of cargo are meant to help prepare the way for future crewed moon missions in NASA's Artemis program.

The rocket took off from the launch platform shortly after 1 a.m., with Odysseus separating from the Falcon 9 and heading moonward about 48 minutes later. Before that, several elements of the rocket separated from the craft and fell back to Earth, to be reused in future missions.

Observers from around the world cheered on Odysseus digitally as NASA livestreamed coverage of the launch on its social media channels.

"Good luck robots," one chat comment read.

IM-1 is the second mission in NASA's Commercial Lunar Payload Services program, in which the agency has contracted with private companies to send a number of payloads and scientific instruments to the moon. The launch comes a month after the first failed flight in the NASA program — Astrobotic's Peregrine lander, which has since crashed. The U.S.-based company United Launch Alliance successfully launched the Peregrine in early January, but the lander's propulsion system malfunctioned mid-flight and put a moon landing out of reach.

"The lander is the tip of the iceberg," Tim Crain, the chief technology officer of Intuitive Machines, said in a prepared statement that NASA aired prior to the launch. "And what's below that is the full program that is on a miniature scale very similar to what the Apollo program did."

NASA is heavily reliant on private corporations like Intuitive Machines, Astrobotic and SpaceX for its Artemis ambitions, with SpaceX also tasked with designing a "human landing system" out of its Starship line of rockets that can ferry crew and goods from lunar orbit to the moon's surface. Yet another company, Axiom, is developing a new generation of lunar spacesuits.

NASA Administrator Bill Nelson announced last month that the agency hoped to put humans on the moon for the first time since 1972 in September 2026, a year's delay from an earlier 2025 target. According to a November 2023 report from the U.S. Government Accountability Office, even the revised date may be too optimistic a timeframe. The report instead predicts a moon landing no earlier than 2027, citing issues with systems being developed by the same private corporations on which NASA is leaning, particularly the SpaceX human landing Systems

"We found that if the human landing system development takes as many months as NASA major projects do, on average, the Artemis III mission would likely occur in early 2027," the office's staff say in the report.

Sandra Connelly, deputy associate administrator for NASA's Science Mission, nevertheless defended the cooperative program and the increasing privatization of space exploration prior to the Odysseus launch, saying the agency would stand "shoulder-to-shoulder" with its contractors.

"It really is transforming our method of doing business," Connelly said. "It's leveraging industries' emerging capabilities of actually providing end-to-end service for us."

The NASA cargo the Odysseus is carrying includes six scientific instruments meant to further study the science of lunar landings and their effect on the moon's surface. NASA is paying Intuitive Machines some $118 million to ferry those instruments to the moon.

The other six payloads are commercial, ranging from a thermal insulation panel developed by Columbia Sportswear — reportedly made from the same metallic material the company uses to line some of its winter jackets — to a series of moon statuettes made by artist Jeff Koons. The Odysseus is also carrying the "EagleCam," developed at Embry–Riddle Aeronautical University. If all goes to plan, the detachable camera will separate from the Odysseus prior to landing to capture the first ever third-person footage of a spacecraft touching down on the moon.

It's still not clear if all will go to plan. Chris Culbert, the program manager of NASA's private partnership program, congratulated Intuitive Machines on a successful launch about an hour after the Falcon 9 left the launchpad but reminded observers that the IM-1 mission was only beginning.

"This is a good start, but this isn't the end yet," Culbert said. "They've got to finish the next step."

He also cautioned the Intuitive Machines team to stay focused as they prepared the Odysseus to enter lunar orbit and eventually attempt a landing.

"Space is hard," he said. "Small mistakes can doom you."

Follow @djbyrnes1
Categories / Business, Science, Technology

Subscribe to our free newsletters

Our weekly newsletter Closing Arguments offers the latest about ongoing trials, major litigation and rulings in courthouses around the U.S. and the world, while the monthly Under the Lights dishes the legal dirt from Hollywood, sports, Big Tech and the arts.